Major Work Activity C - Installs piping

Table of Contents

Task C-11 Prepares pipe, tube and fittings for installation

Task Descriptor

Sprinkler fitters prepare pipe, tube and fittings for the installation of the fire protection system. This preparation can be done at a shop or on-site. This includes cutting, bending, threading, grooving, drilling and grinding.

C-11.01 - Cuts pipe and tube

C-11.01 - Cuts pipe and tube
NL NS PE NB QC ON MB SK AB BC NT YT NU
yes yes NV yes yes yes yes yes yes yes NV NV NV
Skills
Reference Code Performance Criteria Evidence of Attainment
C-11.01.01P select and use tools and equipment tools and equipment are selected and used according to task, pipe material and size
C-11.01.02P select pipe pipe is selected according to drawings, project specifications and task
C-11.01.03P calculate, measure and mark pipe pipe requirements are calculated, measured and marked according to drawings, project specifications and task
C-11.01.04P cut and verify pipe pipe is cut and verified according to drawings, manufacturers' and project specifications, and task
C-11.01.05P ream pipe pipe is reamed to remove burrs to promote hydraulic efficiency

Range of Variables (include, but not limited to)

Knowledge
Reference Code Learning Outcomes and Objectives
C-11.01.01L demonstrate knowledge of pipe and tube, their characteristics and applications
  1. identify types of pipe and tube, and describe their characteristics and applications
  2. interpret information about cutting pipe and tube found on drawings and specifications
  3. identify factors to consider for selecting pipe and tube for cutting
C-11.01.02L demonstrate knowledge of procedures to measure and cut pipe and tube
  1. identify tools and equipment used to cut pipe and tube, and describe their procedures for use
  2. identify workplace hazards, and describe safe work practices for cutting pipe and tube
  3. describe procedures to cut and verify pipe and tube
  4. explain trade math concepts for piping
  5. apply metric and imperial measurements
C-11.01.03L demonstrate knowledge of regulatory requirements for cutting pipe and tube
  1. identify codes, standards and regulations for cutting pipe and tube
C-11.01.04L demonstrate knowledge of sustainability and environmental stewardship practices
  1. identify practices that contribute to environmental protection
  2. describe procedures to dispose of and recycle pipe and tube

Range of Variables (include, but not limited to)

C-11.02 - Bends pipe and tube

C-11.02 - Bends pipe and tube
NL NS PE NB QC ON MB SK AB BC NT YT NU
yes yes NV yes yes yes yes no yes no NV NV NV
Skills
Reference Code Performance Criteria Evidence of Attainment
C-11.02.01P select pipe schedule and pipe material pipe schedule and pipe material is selected according to drawings, project specifications, task, and codes, standards and regulations
C-11.02.02P select application and location of bend application and location for bend is selected according to codes, standards and regulations
C-11.02.03P determine radius of bend radius of bend is determined according to codes, standards and regulations
C-11.02.04P calculate bend angle bend angle is calculated according to installation requirements and site conditions
C-11.02.05P select and use tools and equipment tools and equipment are selected and used according to task, pipe material and size
C-11.02.06P bend pipe and tube pipe and tube are bent to calculated angle

Range of Variables (include, but not limited to)

Knowledge
Reference Code Learning Outcomes and Objectives
C-11.02.01L demonstrate knowledge of pipe and tube, their characteristics and applications
  1. identify types of pipe and tube, and describe their characteristics and applications
  2. interpret information about bending pipe and tube found on drawings and specifications
  3. identify factors to consider for selecting pipe and tube for bending
C-11.02.02L demonstrate knowledge of procedures to measure and bend pipe and tube
  1. identify tools and equipment used to bend pipe and tube, and describe their procedures for use
  2. identify workplace hazards, and describe safe work practices for bending pipe and tube
  3. describe procedures to bend pipe and tube
  4. describe basic trigonometry used to calculate angles
  5. apply metric and imperial measurements
  6. describe procedures to inspect bent pipe and tube
C-11.02.03L demonstrate knowledge of regulatory requirements for bending pipe and tube
  1. identify codes, standards and regulations for bending pipe and tube

Range of Variables (include, but not limited to)

C-11.03 - Threads pipe

C-11.03 - Threads pipe
NL NS PE NB QC ON MB SK AB BC NT YT NU
yes yes NV yes yes yes yes yes yes yes NV NV NV
Skills
Reference Code Performance Criteria Evidence of Attainment
C-11.03.01P select pipe schedule and material pipe schedule and material is selected according to drawings, project specifications, and codes, standards and regulations
C-11.03.02P select and use tools and equipment tools and equipment are selected and used according to size and type of material
C-11.03.03P support pipe pipe is supported using pipe stands while threading to prevent damage to thread and equipment
C-11.03.04P adjust die head die head is adjusted to achieve thread specifications
C-11.03.05P select and apply cutting oil cutting oil is selected and applied according to piping material and compatibility
C-11.03.06P thread pipe pipe is threaded according to thread specifications
C-11.03.07P clean inside and outside of pipe inside and outside of pipe is cleaned to remove excess cutting oil and shavings
C-11.03.08P verify thread thread is verified according to thread specifications
C-11.03.09P dispose of hazardous waste hazardous waste is disposed of according to codes, standards and regulations

Range of Variables (include, but not limited to)

Knowledge
Reference Code Learning Outcomes and Objectives
C-11.03.01L demonstrate knowledge of pipes, their characteristics and applications
  1. identify types of pipe, and describe their characteristics and applications
  2. identify types of thread, and describe their thread specifications, characteristics and applications
  3. interpret information about threading pipe found on drawings and specifications
C-11.03.02L demonstrate knowledge of procedures to thread pipe
  1. identify tools and equipment used to thread pipe, and describe their procedures for use
  2. identify workplace hazards, and describe safe work practices for threading pipe
  3. describe procedures to thread pipe
  4. describe procedures to verify threads
  5. describe procedures to clean pipe after threading
  6. identify types of cutting oils, and describe their characteristics and applications
C-11.03.03L demonstrate knowledge of regulatory requirements for threading pipe
  1. identify codes, standards and regulations for threading pipe
C-11.03.04L demonstrate knowledge of sustainability and environmental stewardship practices
  1. identify practices that contribute to environmental protection
  2. describe procedures to dispose of and recycle cutting oils and shavings

Range of Variables (include, but not limited to)

C-11.04 - Grooves pipe and tube

C-11.04 - Grooves pipe and tube
NL NS PE NB QC ON MB SK AB BC NT YT NU
yes yes NV yes yes yes yes yes yes yes NV NV NV
Skills
Reference Code Performance Criteria Evidence of Attainment
C-11.04.01P select pipe or tube schedule and material pipe or tube schedule and material is selected according to drawings, project specifications, task, and codes, standards and regulations
C-11.04.02P select grooving method grooving method is selected according to manufacturers' specifications, and pipe schedule, material and size
C-11.04.03P select and use tools and equipment tools and equipment are selected and used according to task
C-11.04.04P set up equipment equipment is set up to achieve groove depth according to manufacturers' specifications
C-11.04.05P support pipe or tube pipe or tube is supported using pipe stands to prevent damage to groove and equipment
C-11.04.06P select and apply cutting oil cutting oil is selected and applied according to piping material and compatibility
C-11.04.07P measure and verify groove dimensions groove dimensions are measured and verified to ensure they are within manufacturers' specifications
C-11.04.08P dispose of hazardous waste hazardous waste is disposed of according to codes, standards and regulations

Range of Variables (include, but not limited to)

Knowledge
Reference Code Learning Outcomes and Objectives
C-11.04.01L demonstrate knowledge of pipe and tube, their characteristics and applications
  1. identify types of pipe and tube, and describe their characteristics and applications
  2. interpret information about grooving pipe and tube found on drawings and specifications
C-11.04.02L demonstrate knowledge of procedures to groove pipe
  1. identify tools and equipment used to groove pipe, and describe their procedures for use
  2. identify workplace hazards, and describe safe work practices for grooving pipe
  3. describe procedures to groove pipe, and associated grooving methods
  4. describe procedures to measure and verify grooves
  5. identify types of cutting oils, and describe their characteristics and applications
C-11.04.03L demonstrate knowledge of regulatory requirements for grooving pipe
  1. identify codes, standards and regulations for grooving pipe
C-11.04.04L demonstrate knowledge of sustainability and environmental stewardship practices
  1. identify practices that contribute to environmental protection
  2. describe procedures to dispose of and recycle cutting oils and shavings

Range of Variables (include, but not limited to)

C-11.05 - Drills pipe and tube

C-11.05 - Drills pipe and tube
NL NS PE NB QC ON MB SK AB BC NT YT NU
yes yes NV yes yes yes yes yes yes yes NV NV NV
Skills
Reference Code Performance Criteria Evidence of Attainment
C-11.05.01P measure and mark pipe and tube pipe and tube is measured and marked according to drawings, project specifications and task
C-11.05.02P select and use tools and equipment tools and equipment are selected and used according to task
C-11.05.03P find centre of pipe or tube centre of pipe or tube is found using centring tool
C-11.05.04P drill hole in pipe or tube hole in pipe or tube is drilled according to fitting and device specifications
C-11.05.05P file hole hole is filed to remove burrs
C-11.05.06P recover cut-out disc cut-out disc is recovered to prevent obstruction to flow
C-11.05.07P clean inside and outside of pipe or tube inside and outside of pipe or tube is cleaned to remove foreign materials
Knowledge
Reference Code Learning Outcomes and Objectives
C-11.05.01L demonstrate knowledge of pipe and tube, their characteristics and applications
  1. identify types of pipe and tube, and describe their characteristics and applications
  2. interpret information about drilling pipe and tube found on drawings and specifications
C-11.05.02L demonstrate knowledge of procedures to drill pipe and tube
  1. identify tools and equipment used to drill pipe and tube, and describe their procedures for use
  2. identify workplace hazards, and describe safe work practices for drilling pipe and tube
  3. describe procedures to drill pipe and tube
  4. describe procedures to determine centre of pipe and tube
  5. describe procedures to clean pipe and tube after drilling
C-11.05.03L demonstrate knowledge of regulatory requirements for drilling pipe and tube
  1. identify codes, standards and regulations for drilling pipe and tube
C-11.05.04L demonstrate knowledge of sustainability and environmental stewardship practices
  1. identify practices that contribute to environmental protection
  2. describe procedures to dispose of and recycle pipe and tube

C-11.06 - Grinds pipe

C-11.06 - Grinds pipe
NL NS PE NB QC ON MB SK AB BC NT YT NU
yes yes NV yes yes yes yes yes yes yes NV NV NV
Skills
Reference Code Performance Criteria Evidence of Attainment
C-11.06.01P select and use tools and equipment tools and equipment are selected and used according to task
C-11.06.02P secure pipe pipe is secured while grinding to prevent damage to pipe and equipment
C-11.06.03P grind pipe ends pipe ends are ground to ensure they are square and true
C-11.06.04P bevel pipe pipe is bevelled at angle to promote weld penetration according to industry standards and manufacturers' specifications
Knowledge
Reference Code Learning Outcomes and Objectives
C-11.06.01L demonstrate knowledge of pipe, their characteristics and applications
  1. identify types of pipe, and describe their characteristics and applications
  2. interpret information about grinding pipe found on drawings and specifications
C-11.06.02L demonstrate knowledge of procedures to grind pipe
  1. identify tools and equipment used to grind pipe, and describe their procedures for use
  2. identify workplace hazards, and describe safe work practices for grinding pipe
  3. describe procedures to grind pipe
  4. describe procedures to bevel pipe
C-11.06.03L demonstrate knowledge of regulatory requirements for grinding pipe
  1. identify codes, standards and regulations for grinding pipe

C-11.07 - Prepares fittings

C-11.07 - Prepares fittings
NL NS PE NB QC ON MB SK AB BC NT YT NU
yes yes NV yes yes yes yes yes yes yes NV NV NV
Skills
Reference Code Performance Criteria Evidence of Attainment
C-11.07.01P select fittings fittings are selected according to connection type, pipe size drawings, project specifications and task
C-11.07.02P inspect fitting fitting is inspected for deficiencies
C-11.07.03P select and use tools and materials tools and materials are selected and used according to task and standards
C-11.07.04P clean, grease, sand, file, grind or flux fitting fitting is cleaned, greased, sanded, filed, ground or fluxed according to connection type

Range of Variables (include, but not limited to)

Knowledge
Reference Code Learning Outcomes and Objectives
C-11.07.01L demonstrate knowledge of pipe and tube, their fittings, characteristics and applications
  1. identify types of pipe and tube, and describe their characteristics and applications
  2. identify types of pipe and tube fitting materials, and describe their characteristics and applications
  3. interpret information about fittings found on drawings and specifications
C-11.07.02L demonstrate knowledge of procedures to prepare fittings
  1. identify tools and materials used to prepare fittings, and describe their procedures for use
  2. identify workplace hazards, and describe safe work practices for preparing fittings
  3. describe procedures to prepare fittings
  4. describe procedures to inspect fittings
C-11.07.03L demonstrate knowledge of regulatory requirements for preparing fittings
  1. identify codes, standards and regulations for preparing fittings
C-11.07.04L demonstrate knowledge of sustainability and environmental stewardship practices
  1. identify practices that contribute to environmental protection
  2. describe procedures to dispose of and recycle fittings

Range of Variables (include, but not limited to)

Task C-12 Installs pipe, tube and fittings

Task Descriptor

Sprinkler fitters connect various types of pipes, tubes and fittings (steel, non-metallic and copper) to distribute water from a predetermined source to provide reliable and adequate fire protection. They are responsible for painting and labelling pipe and tube post- installation when required.

C-12.01 - Installs steel pipe, tube and fittings

C-12.01 - Installs steel pipe, tube and fittings
NL NS PE NB QC ON MB SK AB BC NT YT NU
yes yes NV yes yes yes yes yes yes yes NV NV NV
Skills
Reference Code Performance Criteria Evidence of Attainment
C-12.01.01P verify location and spacing location and spacing are verified according to drawings, project specifications, and codes, standards and regulations
C-12.01.02P modify steel pipe and tube layout steel pipe and tube layout is modified according to site conditions and design considerations
C-12.01.03P select and use tools and equipment tools and equipment are selected and used according to task
C-12.01.04P install fittings on steel pipe and tube fittings are installed on steel pipe and tube according to drawings, project specifications, and codes, standards and regulations
C-12.01.05P install steel pipe and tube in hangers, supports, restraints and bracing steel pipe and tube are installed in hangers, supports, restraints and bracing according to drawings, project specifications, and codes, standards and regulations
C-12.01.06P connect steel pipes and tubes steel pipes and tubes are connected using fittings according to drawings, and project and manufacturers' specifications
C-12.01.07P orient fittings fittings are oriented according to application and site conditions
C-12.01.08P level or pitch steel pipe and tube steel pipe and tube is run level or pitched according to drawings, project specifications, and codes, standards and regulations
C-12.01.09P install rigid joints, flexible joints or seismic separation assemblies rigid joints, flexible joints or seismic separation assemblies are installed according to AHJ, and codes, standards and regulations

Range of Variables (include, but not limited to)

Knowledge
Reference Code Learning Outcomes and Objectives
C-12.01.01L demonstrate knowledge of steel pipe, tube and fittings, their characteristics and applications
  1. identify types of steel pipe, tube and fittings, and describe their characteristics and applications
  2. interpret information about steel pipe, tube and fittings installation found on drawings and specifications
C-12.01.02L demonstrate knowledge of procedures to install steel pipe, tube and fittings
  1. identify tools and equipment used to install steel pipe, tube and fittings, and describe their procedures for use
  2. identify workplace hazards, and describe safe work practices for installing steel pipe, tube and fittings
  3. describe procedures to install steel pipe, tube and fittings
  4. describe connection types related to steel pipe and tube
  5. explain friction loss as it applies to steel pipe schedules and hydraulically calculated systems
  6. identify design considerations for installing steel pipe, tube and fittings
  7. describe procedures to install rigid joints, flexible joints or seismic separation assemblies
C-12.01.03L demonstrate knowledge of training and certification requirements to weld steel pipe, tube and fittings
  1. identify training and certification requirements to weld steel pipe, tube and fittings
C-12.01.04L demonstrate knowledge of regulatory requirements for installing steel pipe, tube and fittings
  1. identify codes, standards and regulations for installing steel pipe, tube and fittings
C-12.01.05L demonstrate knowledge of sustainability and environmental stewardship practices
  1. identify practices that contribute to environmental protection
  2. describe procedures to dispose of and recycle steel pipe, tube and fittings

Range of Variables (include, but not limited to)

C-12.02 - Installs non-metallic pipe, tube and fittings

C-12.02 - Installs non-metallic pipe, tube and fittings
NL NS PE NB QC ON MB SK AB BC NT YT NU
yes yes NV yes yes yes yes yes yes yes NV NV NV
Skills
Reference Code Performance Criteria Evidence of Attainment
C-12.02.01P verify location and spacing location and spacing are verified according to drawings, project specifications, and codes, standards and regulations
C-12.02.02P modify non-metallic pipe and tube layout non-metallic pipe and tube layout is modified according to site conditions and design considerations
C-12.02.03P select and use tools and equipment tools and equipment are selected and used according to task
C-12.02.04P install fittings on non-metallic pipe and tube fittings are installed on non-metallic pipe and tube according to drawings, project specifications, and codes, standards and regulations
C-12.02.05P install non-metallic pipe and tube in hangers, supports, restraints and bracing non-metallic pipe and tube are installed in hangers, supports, restraints and bracing according to drawings, project specifications, and codes, standards and regulations
C-12.02.06P connect non-metallic pipes and tubes non-metallic pipes and tubes are connected using fittings according to drawings, and project and manufacturers' specifications
C-12.02.07P orient fittings fittings are oriented according to application and site conditions
C-12.02.08P level or pitch non-metallic pipe and tube non-metallic pipe and tube are run level or pitched according to drawings, project specifications, and codes, standards and regulations

Range of Variables (include, but not limited to)

Knowledge
Reference Code Learning Outcomes and Objectives
C-12.02.01L demonstrate knowledge of non-metallic pipe, tube and fittings, their characteristics and applications
  1. identify types of non-metallic pipe, tube and fittings, and describe their characteristics and applications
  2. interpret information about non-metallic pipe, tube and fittings installation found on drawings and specifications
C-12.02.02L demonstrate knowledge of procedures to install non-metallic pipe, tube and fittings
  1. identify tools and equipment used to install non-metallic pipe, tube and fittings, and describe their procedures for use
  2. identify workplace hazards, and describe safe work practices for installing non-metallic pipe, tube and fittings
  3. describe procedures to install non-metallic pipe, tube and fittings
  4. identify design considerations for installing non-metallic pipe, tube and fittings
  5. describe connection types related to non-metallic pipe and tube
C-12.02.03L demonstrate knowledge of regulatory requirements for installing non- metallic pipe, tube and fittings
  1. identify codes, standards and regulations for installing non-metallic pipe, tube and fittings
C-12.02.04L demonstrate knowledge of sustainability and environmental stewardship practices
  1. identify practices that contribute to environmental protection
  2. describe procedures to dispose of and recycle non-metallic pipe, tube and fittings

Range of Variables (include, but not limited to)

C-12.03 - Installs copper pipe, tube and fittings

C-12.03 - Installs copper pipe, tube and fittings
NL NS PE NB QC ON MB SK AB BC NT YT NU
yes yes NV yes yes yes yes yes yes yes NV NV NV
Skills
Reference Code Performance Criteria Evidence of Attainment
C-12.03.01P verify location and spacing location and spacing are verified according to drawings, project specifications, and codes, standards and regulations
C-12.03.02P modify copper pipe and tube layout copper pipe and tube layout is modified according to site conditions and design considerations
C-12.03.03P select and use tools and equipment tools and equipment are selected and used according to task
C-12.03.04P select materials materials are selected according to drawings, project specifications, and codes, standards and regulations
C-12.03.05P prepare copper pipe and tube copper pipe and tube is prepared for installation according to manufacturers' specifications, and codes, standards and regulations
C-12.03.06P install fittings on pipe and tube fittings are installed on pipe and tube according to drawings, project specifications, and codes, standards and regulations
C-12.03.07P install dielectric fittings dielectric fittings are installed when joining dissimilar metals
C-12.03.08P install copper pipe and tube in hangers, supports, restraints and bracing copper pipe and tube are installed in hangers, supports, restraints and bracing according to drawings, project specifications, and codes, standards and regulations
C-12.03.09P connect copper pipes and tubes copper pipes and tubes are connected using fittings according to drawings, and project and manufacturers' specifications
C-12.03.10P orient fittings fittings are oriented according to application and site conditions
C-12.03.11P level or pitch copper pipe and tube copper pipe and tube are run level or pitched according to drawings, project specifications, and codes, standards and regulations

Range of Variables (include, but not limited to)

Knowledge
Reference Code Learning Outcomes and Objectives
C-12.03.01L demonstrate knowledge of copper pipe, tube and fittings, their components, characteristics, applications and operation
  1. identify types of copper pipe, tube and fittings, and describe their characteristics and applications
  2. interpret information about copper pipe, tube and fittings found on drawings and specifications
C-12.03.02L demonstrate knowledge of procedures to install copper pipe, tube and fittings
  1. identify tools and equipment used to install copper pipe, tube and fittings, and describe their procedures for use
  2. identify workplace hazards, and describe safe work practices for installing copper pipe, tube and fittings
  3. describe procedures to install copper pipe, tube and fittings
  4. describe connection types related to copper pipe and tube
  5. explain effect of electrolysis on piping and tubing materials
  6. explain effect of galvanic corrosion on piping and tubing materials
  7. explain friction loss as it applies to copper pipe and tube, and hydraulically calculated systems
  8. identify design considerations for installing copper pipe, tube and fittings
  9. describe procedures to prepare and assemble flare and compression joints using hand tools
C-12.03.03L demonstrate knowledge of procedures to braze and solder joints
  1. identify tools and equipment used to braze and solder joints, and describe their procedures for use
  2. identify workplace hazards, and describe safe work practices for brazing and soldering joints
  3. describe procedures to braze and solder joints
  4. identify materials and equipment used for brazing and soldering joints, and describe their applications
  5. identify types of solders and brazing alloys, and describe their characteristics and applications
  6. identify types of flux used in soldering or brazing, and describe their purpose, applications and effects
C-12.03.04L demonstrate knowledge of regulatory requirements for installing copper pipe, tube and fittings
  1. identify codes, standards and regulations for installing copper pipe, tube and fittings
  2. identify codes, standards and regulations for brazing and soldering joints
C-12.03.05L demonstrate knowledge of sustainability and environmental stewardship practices
  1. identify practices that contribute to environmental protection
  2. describe procedures to dispose of and recycle copper pipe, tube and fittings
  3. describe procedures to dispose of and recycle brazing and soldering material

Range of Variables (include, but not limited to)

C-12.04 - Paints and labels pipe, tube and fittings

C-12.04 - Paints and labels pipe, tube and fittings
NL NS PE NB QC ON MB SK AB BC NT YT NU
yes yes NV yes yes yes yes yes yes yes NV NV NV
Skills
Reference Code Performance Criteria Evidence of Attainment
C-12.04.01P select and use tools and equipment tools and equipment are selected and used according to task
C-12.04.02P select paint paint used for identification and corrosion protection is selected according to project and manufacturers' specifications
C-12.04.03P mix paint and epoxy paint and epoxy are mixed according to manufacturers’ specifications
C-12.04.04P paint over wrench marks and bare threads wrench marks and bare threads are painted over according to project specifications
C-12.04.05P install labels on pipe labels are installed on pipe according to project specifications
C-12.04.06P dispose of hazardous waste hazardous waste is disposed of according to codes, standards and regulations
Knowledge
Reference Code Learning Outcomes and Objectives
C-12.04.01L demonstrate knowledge of procedures to paint and label pipe, tube and fittings
  1. identify tools and equipment used to paint and label pipe, tube and fittings, and describe their procedures for use
  2. identify workplace hazards, and describe safe work practices for painting and labelling pipe, tube and fittings
  3. describe procedures to paint and label pipe, tube and fittings
  4. identify symbols for labelling pipe, tube and fittings
  5. interpret information about labeling pipe, tube and fittings found on drawings and specifications
C-12.04.02L demonstrate knowledge of standards for painting and labelling pipe, tube and fittings
  1. identify standards for painting and labelling pipe, tube and fittings
C-12.04.03L demonstrate knowledge of sustainability and environmental stewardship practices
  1. identify practices that contribute to environmental protection
  2. describe procedures to dispose of and recycle painting and labelling materials

Task C-13 Installs piping components

Task Descriptor

Sprinkler fitters connect various types of components such as sprinklers, nozzles, valves, pipe sleeves, hangers, supports, restraints and bracing, cross-connection control assemblies and system drainage to the piping system to achieve a complete and effective fire protection system.

C-13.01 - Selects sprinklers and nozzles

C-13.01 - Selects sprinklers and nozzles
NL NS PE NB QC ON MB SK AB BC NT YT NU
yes yes NV yes yes yes yes yes yes yes NV NV NV
Skills
Reference Code Performance Criteria Evidence of Attainment
C-13.01.01P identify sprinklers’ temperature classification sprinklers’ temperature classification is identified according to drawings, manufacturers’ and project specifications, and codes, standards and regulations
C-13.01.02P identify sprinklers and nozzles sprinklers and nozzles are identified to provide coverage according to conditions, occupancy classifications and storage arrangement, drawings, manufacturers’ and project specifications, and codes, standards and regulations
C-13.01.03P interpret information on sprinkler and nozzle listing and manufacturers’ data sheet information on sprinkler and nozzle listing and manufacturers’ data sheet is interpreted to provide installation limitations

Range of Variables (include, but not limited to)

Knowledge
Reference Code Learning Outcomes and Objectives
C-13.01.01L demonstrate knowledge of sprinklers and nozzles, their components, characteristics, applications and operation
  1. identify types of sprinklers and nozzles, and describe their characteristics and applications
  2. describe operating principles of sprinklers and nozzles
  3. describe fire tetrahedron and properties of water
  4. interpret information about sprinklers and nozzles found on drawings, specifications, sprinkler and nozzle listing and manufacturers’ data sheet
C-13.01.02L demonstrate knowledge of procedures to select sprinklers and nozzles
  1. identify workplace hazards, and describe safe work practices for sprinklers and nozzles
  2. describe procedures to select sprinklers and nozzles
  3. identify conditions, hazard classification and storage arrangements for selecting sprinklers
  4. identify temperature ratings and colour coding
  5. identify performance characteristics that apply to sprinklers
  6. identify location requirements
C-13.01.03L demonstrate knowledge of regulatory requirements for sprinklers and nozzles
  1. identify codes, standards and regulations for sprinklers and nozzles

Range of Variables (include, but not limited to)

C-13.02 - Installs sprinklers and nozzles

C-13.02 - Installs sprinklers and nozzles
NL NS PE NB QC ON MB SK AB BC NT YT NU
yes yes NV yes yes yes yes yes yes yes NV NV NV
Skills
Reference Code Performance Criteria Evidence of Attainment
C-13.02.01P select and use tools and equipment tools and equipment are selected and used according to task and manufacturers' specifications
C-13.02.02P inspect sprinklers and nozzles for damage or defects sprinklers and nozzles are inspected for damage or defects
C-13.02.03P apply thread lubricant thread lubricant is applied to prevent leakage and ensure fit according to industry practices and manufacturers' specifications
C-13.02.04P position and install sprinklers and nozzles sprinklers and nozzles are positioned and installed according to drawings, manufacturers’ and project specifications, and codes, standards and regulations
C-13.02.05P select and install temporary sprinkler protectors temporary sprinkler protectors are selected and installed to protect sprinklers and nozzles from potential damage until job is completed
C-13.02.06P select and install escutcheons and cover plates escutcheons and cover plates are selected and installed according to manufacturers' specifications
C-13.02.07P select and install permanent sprinkler protectors permanent sprinkler protectors are selected and installed according to manufacturers' specifications and site conditions

Range of Variables (include, but not limited to)

Knowledge
Reference Code Learning Outcomes and Objectives
C-13.02.01L demonstrate knowledge of sprinklers and nozzles, their components, characteristics, applications and operation
  1. identify types of sprinklers and nozzles, and describe their characteristics and applications
  2. describe operating principles of sprinklers, nozzles and finishing plates
  3. interpret information about sprinklers and nozzles found on drawings and specifications
C-13.02.02L demonstrate knowledge of procedures to install sprinklers and nozzles and their components
  1. identify tools and equipment used to install sprinklers and nozzles and their components, and describe their procedures for use
  2. identify workplace hazards, and describe safe work practices for installing sprinklers and nozzles and their components
  3. describe procedures to install sprinklers and nozzles and their components
  4. describe procedures used, and factors to consider for the care and handling of sprinklers and nozzles prior to and during installation process
  5. explain importance of correct positioning for sprinklers and nozzles
  6. identify spacing and obstruction requirements based on occupancy classification, drawings, manufacturers’ and project specifications, codes, standards and regulations
  7. identify clearances required between piled storage materials and sprinkler deflectors
  8. identify factors that affect maximum ceiling temperature
  9. identify temperature ratings and colour coding
  10. identify performance characteristics that apply to sprinklers and nozzles
C-13.02.03L demonstrate knowledge of regulatory requirements for installing sprinklers and nozzles
  1. identify codes, standards and regulations for installing sprinklers and nozzles
C-13.02.04L demonstrate knowledge of sustainability and environmental stewardship practices
  1. identify practices that contribute to environmental protection
  2. describe procedures to dispose of and recycle sprinklers and nozzles

Range of Variables (include, but not limited to)

C-13.03 - Installs pipe sleeves

C-13.03 - Installs pipe sleeves
NL NS PE NB QC ON MB SK AB BC NT YT NU
yes yes NV yes yes yes yes yes yes yes NV NV NV
Skills
Reference Code Performance Criteria Evidence of Attainment
C-13.03.01P select pipe sleeve material, diameter and length pipe sleeve material, diameter and length are selected according to factors
C-13.03.02P select and use tools and equipment tools and equipment are selected and used according to task
C-13.03.03P measure and determine pipe sleeve location pipe sleeve location is measured and determined according to drawings and concrete scanning
C-13.03.04P attach pipe sleeve to forms pipe sleeve is attached to forms using nails or screws when installed prior to concrete pour according to industry standards
C-13.03.05P core penetrations for pipe sleeves penetrations are cored for pipe sleeves through existing concrete according to task
C-13.03.06P select and apply fire stopping, caulking and sealant fire stopping, caulking and sealant are selected and applied according to drawings, manufacturers’ and project specifications, and codes, standards and regulations

Range of Variables (include, but not limited to)

Knowledge
Reference Code Learning Outcomes and Objectives
C-13.03.01L demonstrate knowledge of pipe sleeves, their characteristics and applications
  1. identify types of pipe sleeves, and describe their characteristics and applications
  2. interpret information about pipe sleeves found on drawings, and manufacturers’ and project specifications
C-13.03.02L demonstrate knowledge of procedures to size and install pipe sleeves
  1. identify tools and equipment used to size and install pipe sleeves, and describe their procedures for use
  2. identify workplace hazards, and describe safe work practices for installing pipe sleeves
  3. identify factors for selecting pipe sleeve material, diameter and length
  4. describe procedures to install pipe sleeves
  5. describe procedures to determine location of pipe sleeves
  6. describe fire rating requirements for penetrations
C-13.03.03L demonstrate knowledge of regulatory requirements for installing sleeves
  1. identify codes, standards and regulations for installing sleeves
C-13.02.04L demonstrate knowledge of sustainability and environmental stewardship practices
  1. identify practices that contribute to environmental protection
  2. describe procedures to dispose of and recycle coring material

Range of Variables (include, but not limited to)

C-13.04 - Installs hangers, supports, restraints and bracing

C-13.04 - Installs hangers, supports, restraints and bracing
NL NS PE NB QC ON MB SK AB BC NT YT NU
yes yes NV yes yes yes yes yes yes yes NV NV NV
Skills
Reference Code Performance Criteria Evidence of Attainment
C-13.04.01P select hangers, supports, restraints and bracing hangers, supports, restraints and bracing are selected according to factors
C-13.04.02P select and use tools and equipment tools and equipment are selected and used according to task
C-13.04.03P calculate size and material of trapeze hangers size and material of trapeze hangers is calculated according to codes, standards and regulations
C-13.04.04P calculate rod or brace size and length rod or brace size and length are calculated according to factors
C-13.04.05P cut rod or bracing materials rod or bracing materials are cut to length according to site conditions
C-13.04.06P select and install attachment points for hangers, supports, restraints and bracing attachment points for hangers, supports, restraints and bracing are selected and installed according to codes, standards and regulations
C-13.04.07P fasten hangers, supports, restraints and bracing hangers, supports, restraints and bracing are fastened to attachment points and piping on structure material according to factors
C-13.04.08P select location, material, diameter, angle and length of hangers, supports, restraints and bracing location, material, diameter, angle and length of hangers, supports, restraints and bracing are selected according to factors
C-13.04.09P installs hangers, supports, restraints and bracing to prevent movement hangers, supports, restraints and bracing are installed to prevent pipe movement

Range of Variables (include, but not limited to)

Knowledge
Reference Code Learning Outcomes and Objectives
C-13.04.01L demonstrate knowledge of hangers, supports, restraints and bracing, their components, characteristics and applications
  1. identify types of hangers, supports, restraints and bracing used in installation of pipe and tube, and describe their characteristics and applications
  2. identify types of bracing materials, and describe their characteristics and applications
  3. interpret information about hangers, supports, restraints and bracing found on drawings and specifications
C-13.04.02L demonstrate knowledge of procedures to install hangers, supports, restraints and bracing
  1. identify tools and equipment used to install hangers, supports, restraints and bracing, and describe their procedures for use
  2. identify workplace hazards, and describe safe work practices for installing hangers, supports, restraints and bracing
  3. describe procedures to install hangers, supports, restraints and bracing
  4. describe procedures to install fasteners into structure material
  5. identify calculations and factors to provide pitch
  6. identify hangers, supports, restraints and bracing requirements for various systems
  7. describe principles of sway/seismic bracing and movement
  8. identify types and sizes of hanger rods, and describe their characteristics and applications
  9. identify types of protective materials applied to hangers, and describe their purpose and applications
  10. identify types of fasteners and inserts, and describe their characteristics and applications
C-13.04.03L demonstrate knowledge of regulatory requirements for hangers, supports, restraints and bracing
  1. identify codes, standards and regulations for hangers, supports, restraints and bracing
C-13.04.04L demonstrate knowledge of sustainability and environmental stewardship practices
  1. identify practices that contribute to environmental protection
  2. describe procedures to dispose of and recycle hangers, supports, restraints and bracing

Range of Variables (include, but not limited to)

C-13.05 - Installs cross-connection control assemblies

C-13.05 - Installs cross-connection control assemblies
NL NS PE NB QC ON MB SK AB BC NT YT NU
yes yes NV yes yes yes yes yes yes yes NV NV NV
Skills
Reference Code Performance Criteria Evidence of Attainment
C-13.05.01P select and use tools and equipment tools and equipment are selected and used according to task
C-13.05.02P select and install cross-connection control assemblies cross-connection control assemblies are selected and installed according to drawings, manufacturers’ and project specifications, and codes, standards and regulations
C-13.05.03P install means for forward flow testing means for forward flow testing are installed according to drawings, codes and standards
C-13.05.04P ensure operation of equipment and components equipment and components operate according to manufacturers' specifications, and codes, standards and regulations
Knowledge
Reference Code Learning Outcomes and Objectives
C-13.05.01L demonstrate knowledge of cross-connection control assemblies, their components, characteristics, applications and operation
  1. identify types of cross-connection control assemblies, and describe their characteristics and applications
  2. describe operating principles of cross-connection control assemblies
  3. interpret information about cross-connection control assemblies found on drawings and specifications
C-13.05.02L demonstrate knowledge of procedures to install cross-connection control assemblies
  1. identify tools and equipment used to install cross-connection control assemblies, and describe their procedures for use
  2. identify workplace hazards, and describe safe work practices for installing cross-connection control assemblies
  3. identify factors to consider for selecting and installing cross-connection control assemblies
  4. identify means for forward flow testing, and describe their requirements, arrangements and installation location
  5. describe procedures to install cross-connection control assemblies
C-13.05.03L demonstrate knowledge of training and certification requirements to test cross-connection control assemblies
  1. identify training and certification requirements to test cross-connection control assemblies
C-13.05.04L demonstrate knowledge of regulatory requirements for cross-connection control assemblies
  1. identify codes, standards and regulations for cross-connection control assemblies
C-13.05.05L demonstrate knowledge of sustainability and environmental stewardship practices
  1. identify practices that contribute to environmental protection

Range of Variables (include, but not limited to)

C-13.06 - Installs system drainage

C-13.06 - Installs system drainage
NL NS PE NB QC ON MB SK AB BC NT YT NU
yes yes NV yes yes yes yes yes yes yes NV NV NV
Skills
Reference Code Performance Criteria Evidence of Attainment
C-13.06.01P select and use tools and equipment tools and equipment are selected and used according to task
C-13.06.02P determine pipe size, length and locations of drain lines pipe size, length and locations of drain lines are determined and measured according to drawings, manufacturers’ and project specifications, and codes, standards and regulations
C-13.06.03P determine locations and requirements of components locations and requirements of components are determined according to drawings, manufacturers’ and project specifications, and codes, standards and regulations
C-13.06.04P install drain lines drain lines are installed according to drawings, manufacturers’ and project specifications, and codes, standards and regulations

Range of Variables (include, but not limited to)

Knowledge
Reference Code Learning Outcomes and Objectives
C-13.06.01L demonstrate knowledge of system drainage, their components, characteristics, applications and operation
  1. identify types of system drainage, and describe their characteristics and applications
  2. identify system drainage components and describe their location, purpose and operation
  3. describe operating principles of system drainage
  4. interpret information about system drainage found on drawings and specifications
C-13.06.02L demonstrate knowledge of procedures to layout and install system drainage and components
  1. identify tools and equipment used to layout and install system drainage, and describe their procedures for use
  2. identify workplace hazards, and describe safe work practices for system drainage layout and installation
  3. describe procedures to lay out and install system drainage and components
C-13.06.03L demonstrate knowledge of regulatory requirements for system drainage layout and installation
  1. identify codes, standards and regulations for system drainage layout and installation
C-13.06.04L demonstrate knowledge of sustainability and environmental stewardship practices
  1. identify practices that contribute to environmental protection
  2. describe procedures to dispose of and recycle system drainage components

Range of Variables (include, but not limited to)