Table of Contents
Task C-11 Prepares pipe, tube and fittings for installation
Task Descriptor
Sprinkler fitters prepare pipe, tube and fittings for the installation of the fire protection system. This preparation can be done at a shop or on-site. This includes cutting, bending, threading, grooving, drilling and grinding.
C-11.01 - Cuts pipe and tube
C-11.01 - Cuts pipe and tube
| NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
| yes |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
| Reference Code |
Performance Criteria |
Evidence of Attainment |
| C-11.01.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task, pipe material and size |
| C-11.01.02P |
select pipe |
pipe is selected according to drawings, project specifications and task |
| C-11.01.03P |
calculate, measure and mark pipe |
pipe requirements are calculated, measured and marked according to drawings, project specifications and task |
| C-11.01.04P |
cut and verify pipe |
pipe is cut and verified according to drawings, manufacturers' and project specifications, and task |
| C-11.01.05P |
ream pipe |
pipe is reamed to remove burrs to promote hydraulic efficiency |
Range of Variables (include, but not limited to)
- pipe material: steel, copper, non-metallic, ductile iron
Knowledge
| Reference Code |
Learning Outcomes and Objectives |
| C-11.01.01L |
demonstrate knowledge of pipe and tube, their characteristics and applications
- identify types of pipe and tube, and describe their characteristics and applications
- interpret information about cutting pipe and tube found on drawings and specifications
- identify factors to consider for selecting pipe and tube for cutting
|
| C-11.01.02L |
demonstrate knowledge of procedures to measure and cut pipe and tube
- identify tools and equipment used to cut pipe and tube, and describe their procedures for use
- identify workplace hazards, and describe safe work practices for cutting pipe and tube
- describe procedures to cut and verify pipe and tube
- explain trade math concepts for piping
- apply metric and imperial measurements
|
| C-11.01.03L |
demonstrate knowledge of regulatory requirements for cutting pipe and tube
- identify codes, standards and regulations for cutting pipe and tube
|
| C-11.01.04L |
demonstrate knowledge of sustainability and environmental stewardship practices
- identify practices that contribute to environmental protection
- describe procedures to dispose of and recycle pipe and tube
|
Range of Variables (include, but not limited to)
- factors to consider: size, materials, schedule, NFPA standards
- trade math concepts: Pythagorean theorem, algebra, trigonometry, area and capacity, converting units of measurement
C-11.02 - Bends pipe and tube
C-11.02 - Bends pipe and tube
| NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
| yes |
yes |
NV |
yes |
yes |
yes |
yes |
no |
yes |
no |
NV |
NV |
NV |
Skills
| Reference Code |
Performance Criteria |
Evidence of Attainment |
| C-11.02.01P |
select pipe schedule and pipe material |
pipe schedule and pipe material is selected according to drawings, project specifications, task, and codes, standards and regulations |
| C-11.02.02P |
select application and location of bend |
application and location for bend is selected according to codes, standards and regulations |
| C-11.02.03P |
determine radius of bend |
radius of bend is determined according to codes, standards and regulations |
| C-11.02.04P |
calculate bend angle |
bend angle is calculated according to installation requirements and site conditions |
| C-11.02.05P |
select and use tools and equipment |
tools and equipment are selected and used according to task, pipe material and size |
| C-11.02.06P |
bend pipe and tube |
pipe and tube are bent to calculated angle |
Range of Variables (include, but not limited to)
- pipe material: stainless, copper alloy, carbon steel
Knowledge
| Reference Code |
Learning Outcomes and Objectives |
| C-11.02.01L |
demonstrate knowledge of pipe and tube, their characteristics and applications
- identify types of pipe and tube, and describe their characteristics and applications
- interpret information about bending pipe and tube found on drawings and specifications
- identify factors to consider for selecting pipe and tube for bending
|
| C-11.02.02L |
demonstrate knowledge of procedures to measure and bend pipe and tube
- identify tools and equipment used to bend pipe and tube, and describe their procedures for use
- identify workplace hazards, and describe safe work practices for bending pipe and tube
- describe procedures to bend pipe and tube
- describe basic trigonometry used to calculate angles
- apply metric and imperial measurements
- describe procedures to inspect bent pipe and tube
|
| C-11.02.03L |
demonstrate knowledge of regulatory requirements for bending pipe and tube
- identify codes, standards and regulations for bending pipe and tube
|
Range of Variables (include, but not limited to)
- factors to consider: size, material, schedule, manufacturers' specifications, NFPA standards
C-11.03 - Threads pipe
C-11.03 - Threads pipe
| NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
| yes |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
| Reference Code |
Performance Criteria |
Evidence of Attainment |
| C-11.03.01P |
select pipe schedule and material |
pipe schedule and material is selected according to drawings, project specifications, and codes, standards and regulations |
| C-11.03.02P |
select and use tools and equipment |
tools and equipment are selected and used according to size and type of material |
| C-11.03.03P |
support pipe |
pipe is supported using pipe stands while threading to prevent damage to thread and equipment |
| C-11.03.04P |
adjust die head |
die head is adjusted to achieve thread specifications |
| C-11.03.05P |
select and apply cutting oil |
cutting oil is selected and applied according to piping material and compatibility |
| C-11.03.06P |
thread pipe |
pipe is threaded according to thread specifications |
| C-11.03.07P |
clean inside and outside of pipe |
inside and outside of pipe is cleaned to remove excess cutting oil and shavings |
| C-11.03.08P |
verify thread |
thread is verified according to thread specifications |
| C-11.03.09P |
dispose of hazardous waste |
hazardous waste is disposed of according to codes, standards and regulations |
Range of Variables (include, but not limited to)
- thread specifications: thread depth, taper, pitch, angle, length
Knowledge
| Reference Code |
Learning Outcomes and Objectives |
| C-11.03.01L |
demonstrate knowledge of pipes, their characteristics and applications
- identify types of pipe, and describe their characteristics and applications
- identify types of thread, and describe their thread specifications, characteristics and applications
- interpret information about threading pipe found on drawings and specifications
|
| C-11.03.02L |
demonstrate knowledge of procedures to thread pipe
- identify tools and equipment used to thread pipe, and describe their procedures for use
- identify workplace hazards, and describe safe work practices for threading pipe
- describe procedures to thread pipe
- describe procedures to verify threads
- describe procedures to clean pipe after threading
- identify types of cutting oils, and describe their characteristics and applications
|
| C-11.03.03L |
demonstrate knowledge of regulatory requirements for threading pipe
- identify codes, standards and regulations for threading pipe
|
| C-11.03.04L |
demonstrate knowledge of sustainability and environmental stewardship practices
- identify practices that contribute to environmental protection
- describe procedures to dispose of and recycle cutting oils and shavings
|
Range of Variables (include, but not limited to)
- types of thread: National Pipe Thread (NPT), National Standard Thread (NST), taper, parallel
- thread specifications: thread depth, taper, pitch, angle, length
C-11.04 - Grooves pipe and tube
C-11.04 - Grooves pipe and tube
| NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
| yes |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
| Reference Code |
Performance Criteria |
Evidence of Attainment |
| C-11.04.01P |
select pipe or tube schedule and material |
pipe or tube schedule and material is selected according to drawings, project specifications, task, and codes, standards and regulations |
| C-11.04.02P |
select grooving method |
grooving method is selected according to manufacturers' specifications, and pipe schedule, material and size |
| C-11.04.03P |
select and use tools and equipment |
tools and equipment are selected and used according to task |
| C-11.04.04P |
set up equipment |
equipment is set up to achieve groove depth according to manufacturers' specifications |
| C-11.04.05P |
support pipe or tube |
pipe or tube is supported using pipe stands to prevent damage to groove and equipment |
| C-11.04.06P |
select and apply cutting oil |
cutting oil is selected and applied according to piping material and compatibility |
| C-11.04.07P |
measure and verify groove dimensions |
groove dimensions are measured and verified to ensure they are within manufacturers' specifications |
| C-11.04.08P |
dispose of hazardous waste |
hazardous waste is disposed of according to codes, standards and regulations |
Range of Variables (include, but not limited to)
- grooving methods: roll grooving, cut grooving
- groove dimensions: depth, flare, gasket seat, width, diameter, consistent diameter
Knowledge
| Reference Code |
Learning Outcomes and Objectives |
| C-11.04.01L |
demonstrate knowledge of pipe and tube, their characteristics and applications
- identify types of pipe and tube, and describe their characteristics and applications
- interpret information about grooving pipe and tube found on drawings and specifications
|
| C-11.04.02L |
demonstrate knowledge of procedures to groove pipe
- identify tools and equipment used to groove pipe, and describe their procedures for use
- identify workplace hazards, and describe safe work practices for grooving pipe
- describe procedures to groove pipe, and associated grooving methods
- describe procedures to measure and verify grooves
- identify types of cutting oils, and describe their characteristics and applications
|
| C-11.04.03L |
demonstrate knowledge of regulatory requirements for grooving pipe
- identify codes, standards and regulations for grooving pipe
|
| C-11.04.04L |
demonstrate knowledge of sustainability and environmental stewardship practices
- identify practices that contribute to environmental protection
- describe procedures to dispose of and recycle cutting oils and shavings
|
Range of Variables (include, but not limited to)
- grooving methods: roll grooving, cut grooving
C-11.05 - Drills pipe and tube
C-11.05 - Drills pipe and tube
| NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
| yes |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
| Reference Code |
Performance Criteria |
Evidence of Attainment |
| C-11.05.01P |
measure and mark pipe and tube |
pipe and tube is measured and marked according to drawings, project specifications and task |
| C-11.05.02P |
select and use tools and equipment |
tools and equipment are selected and used according to task |
| C-11.05.03P |
find centre of pipe or tube |
centre of pipe or tube is found using centring tool |
| C-11.05.04P |
drill hole in pipe or tube |
hole in pipe or tube is drilled according to fitting and device specifications |
| C-11.05.05P |
file hole |
hole is filed to remove burrs |
| C-11.05.06P |
recover cut-out disc |
cut-out disc is recovered to prevent obstruction to flow |
| C-11.05.07P |
clean inside and outside of pipe or tube |
inside and outside of pipe or tube is cleaned to remove foreign materials |
Knowledge
| Reference Code |
Learning Outcomes and Objectives |
| C-11.05.01L |
demonstrate knowledge of pipe and tube, their characteristics and applications
- identify types of pipe and tube, and describe their characteristics and applications
- interpret information about drilling pipe and tube found on drawings and specifications
|
| C-11.05.02L |
demonstrate knowledge of procedures to drill pipe and tube
- identify tools and equipment used to drill pipe and tube, and describe their procedures for use
- identify workplace hazards, and describe safe work practices for drilling pipe and tube
- describe procedures to drill pipe and tube
- describe procedures to determine centre of pipe and tube
- describe procedures to clean pipe and tube after drilling
|
| C-11.05.03L |
demonstrate knowledge of regulatory requirements for drilling pipe and tube
- identify codes, standards and regulations for drilling pipe and tube
|
| C-11.05.04L |
demonstrate knowledge of sustainability and environmental stewardship practices
- identify practices that contribute to environmental protection
- describe procedures to dispose of and recycle pipe and tube
|
C-11.06 - Grinds pipe
C-11.06 - Grinds pipe
| NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
| yes |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
| Reference Code |
Performance Criteria |
Evidence of Attainment |
| C-11.06.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task |
| C-11.06.02P |
secure pipe |
pipe is secured while grinding to prevent damage to pipe and equipment |
| C-11.06.03P |
grind pipe ends |
pipe ends are ground to ensure they are square and true |
| C-11.06.04P |
bevel pipe |
pipe is bevelled at angle to promote weld penetration according to industry standards and manufacturers' specifications |
Knowledge
| Reference Code |
Learning Outcomes and Objectives |
| C-11.06.01L |
demonstrate knowledge of pipe, their characteristics and applications
- identify types of pipe, and describe their characteristics and applications
- interpret information about grinding pipe found on drawings and specifications
|
| C-11.06.02L |
demonstrate knowledge of procedures to grind pipe
- identify tools and equipment used to grind pipe, and describe their procedures for use
- identify workplace hazards, and describe safe work practices for grinding pipe
- describe procedures to grind pipe
- describe procedures to bevel pipe
|
| C-11.06.03L |
demonstrate knowledge of regulatory requirements for grinding pipe
- identify codes, standards and regulations for grinding pipe
|
C-11.07 - Prepares fittings
C-11.07 - Prepares fittings
| NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
| yes |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
| Reference Code |
Performance Criteria |
Evidence of Attainment |
| C-11.07.01P |
select fittings |
fittings are selected according to connection type, pipe size drawings, project specifications and task |
| C-11.07.02P |
inspect fitting |
fitting is inspected for deficiencies |
| C-11.07.03P |
select and use tools and materials |
tools and materials are selected and used according to task and standards |
| C-11.07.04P |
clean, grease, sand, file, grind or flux fitting |
fitting is cleaned, greased, sanded, filed, ground or fluxed according to connection type |
Range of Variables (include, but not limited to)
- connection type: flanged, threaded, grooved, soldered, brazed, welded
- deficiencies: cracks, holes, absence of threads
- tools and materials: wire brushes, sand cloth, files, pipe joint compound or tape, flux, gasket lube
Knowledge
| Reference Code |
Learning Outcomes and Objectives |
| C-11.07.01L |
demonstrate knowledge of pipe and tube, their fittings, characteristics and applications
- identify types of pipe and tube, and describe their characteristics and applications
- identify types of pipe and tube fitting materials, and describe their characteristics and applications
- interpret information about fittings found on drawings and specifications
|
| C-11.07.02L |
demonstrate knowledge of procedures to prepare fittings
- identify tools and materials used to prepare fittings, and describe their procedures for use
- identify workplace hazards, and describe safe work practices for preparing fittings
- describe procedures to prepare fittings
- describe procedures to inspect fittings
|
| C-11.07.03L |
demonstrate knowledge of regulatory requirements for preparing fittings
- identify codes, standards and regulations for preparing fittings
|
| C-11.07.04L |
demonstrate knowledge of sustainability and environmental stewardship practices
- identify practices that contribute to environmental protection
- describe procedures to dispose of and recycle fittings
|
Range of Variables (include, but not limited to)
- pipe and tube fitting materials: copper, non-metallic, steel, cast iron
- tools and materials: wire brushes, sand cloth, files, pipe joint compound or tape, flux, gasket lube
- procedures to prepare fittings: clean, grease, sand, file, grind or flux
Task C-12 Installs pipe, tube and fittings
Task Descriptor
Sprinkler fitters connect various types of pipes, tubes and fittings (steel, non-metallic and copper) to distribute water from a predetermined source to provide reliable and adequate fire protection. They are responsible for painting and labelling pipe and tube post- installation when required.
C-12.01 - Installs steel pipe, tube and fittings
C-12.01 - Installs steel pipe, tube and fittings
| NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
| yes |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
| Reference Code |
Performance Criteria |
Evidence of Attainment |
| C-12.01.01P |
verify location and spacing |
location and spacing are verified according to drawings, project specifications, and codes, standards and regulations |
| C-12.01.02P |
modify steel pipe and tube layout |
steel pipe and tube layout is modified according to site conditions and design considerations |
| C-12.01.03P |
select and use tools and equipment |
tools and equipment are selected and used according to task |
| C-12.01.04P |
install fittings on steel pipe and tube |
fittings are installed on steel pipe and tube according to drawings, project specifications, and codes, standards and regulations |
| C-12.01.05P |
install steel pipe and tube in hangers, supports, restraints and bracing |
steel pipe and tube are installed in hangers, supports, restraints and bracing according to drawings, project specifications, and codes, standards and regulations |
| C-12.01.06P |
connect steel pipes and tubes |
steel pipes and tubes are connected using fittings according to drawings, and project and manufacturers' specifications |
| C-12.01.07P |
orient fittings |
fittings are oriented according to application and site conditions |
| C-12.01.08P |
level or pitch steel pipe and tube |
steel pipe and tube is run level or pitched according to drawings, project specifications, and codes, standards and regulations |
| C-12.01.09P |
install rigid joints, flexible joints or seismic separation assemblies |
rigid joints, flexible joints or seismic separation assemblies are installed according to AHJ, and codes, standards and regulations |
Range of Variables (include, but not limited to)
- design considerations: pipe size, hazard classifications, drainage, pitch and layout, materials, system design
- fittings: couplings, flanges, elbows, tees, crosses, adaptors
Knowledge
| Reference Code |
Learning Outcomes and Objectives |
| C-12.01.01L |
demonstrate knowledge of steel pipe, tube and fittings, their characteristics and applications
- identify types of steel pipe, tube and fittings, and describe their characteristics and applications
- interpret information about steel pipe, tube and fittings installation found on drawings and specifications
|
| C-12.01.02L |
demonstrate knowledge of procedures to install steel pipe, tube and fittings
- identify tools and equipment used to install steel pipe, tube and fittings, and describe their procedures for use
- identify workplace hazards, and describe safe work practices for installing steel pipe, tube and fittings
- describe procedures to install steel pipe, tube and fittings
- describe connection types related to steel pipe and tube
- explain friction loss as it applies to steel pipe schedules and hydraulically calculated systems
- identify design considerations for installing steel pipe, tube and fittings
- describe procedures to install rigid joints, flexible joints or seismic separation assemblies
|
| C-12.01.03L |
demonstrate knowledge of training and certification requirements to weld steel pipe, tube and fittings
- identify training and certification requirements to weld steel pipe, tube and fittings
|
| C-12.01.04L |
demonstrate knowledge of regulatory requirements for installing steel pipe, tube and fittings
- identify codes, standards and regulations for installing steel pipe, tube and fittings
|
| C-12.01.05L |
demonstrate knowledge of sustainability and environmental stewardship practices
- identify practices that contribute to environmental protection
- describe procedures to dispose of and recycle steel pipe, tube and fittings
|
Range of Variables (include, but not limited to)
- fittings: couplings, flanges, elbows, tees, crosses, adaptors
- types of steel pipe: stainless, galvanized, carbon
- types of steel tube: stainless, mild
- connection types: grooved couplings, flanged, threaded, welded
- design considerations: pipe size, hazard classifications, drainage, pitch and layout, materials, system design
C-12.02 - Installs non-metallic pipe, tube and fittings
C-12.02 - Installs non-metallic pipe, tube and fittings
| NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
| yes |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
| Reference Code |
Performance Criteria |
Evidence of Attainment |
| C-12.02.01P |
verify location and spacing |
location and spacing are verified according to drawings, project specifications, and codes, standards and regulations |
| C-12.02.02P |
modify non-metallic pipe and tube layout |
non-metallic pipe and tube layout is modified according to site conditions and design considerations |
| C-12.02.03P |
select and use tools and equipment |
tools and equipment are selected and used according to task |
| C-12.02.04P |
install fittings on non-metallic pipe and tube |
fittings are installed on non-metallic pipe and tube according to drawings, project specifications, and codes, standards and regulations |
| C-12.02.05P |
install non-metallic pipe and tube in hangers, supports, restraints and bracing |
non-metallic pipe and tube are installed in hangers, supports, restraints and bracing according to drawings, project specifications, and codes, standards and regulations |
| C-12.02.06P |
connect non-metallic pipes and tubes |
non-metallic pipes and tubes are connected using fittings according to drawings, and project and manufacturers' specifications |
| C-12.02.07P |
orient fittings |
fittings are oriented according to application and site conditions |
| C-12.02.08P |
level or pitch non-metallic pipe and tube |
non-metallic pipe and tube are run level or pitched according to drawings, project specifications, and codes, standards and regulations |
Range of Variables (include, but not limited to)
- design considerations: pipe size, hazard classifications, drainage, pitch and layout, materials, system design, flushing connections, friction loss
- fittings: couplings, flanges, elbows, tees, crosses, adaptors
Knowledge
| Reference Code |
Learning Outcomes and Objectives |
| C-12.02.01L |
demonstrate knowledge of non-metallic pipe, tube and fittings, their characteristics and applications
- identify types of non-metallic pipe, tube and fittings, and describe their characteristics and applications
- interpret information about non-metallic pipe, tube and fittings installation found on drawings and specifications
|
| C-12.02.02L |
demonstrate knowledge of procedures to install non-metallic pipe, tube and fittings
- identify tools and equipment used to install non-metallic pipe, tube and fittings, and describe their procedures for use
- identify workplace hazards, and describe safe work practices for installing non-metallic pipe, tube and fittings
- describe procedures to install non-metallic pipe, tube and fittings
- identify design considerations for installing non-metallic pipe, tube and fittings
- describe connection types related to non-metallic pipe and tube
|
| C-12.02.03L |
demonstrate knowledge of regulatory requirements for installing non- metallic pipe, tube and fittings
- identify codes, standards and regulations for installing non-metallic pipe, tube and fittings
|
| C-12.02.04L |
demonstrate knowledge of sustainability and environmental stewardship practices
- identify practices that contribute to environmental protection
- describe procedures to dispose of and recycle non-metallic pipe, tube and fittings
|
Range of Variables (include, but not limited to)
- fittings: couplings, flanges, elbows, tees, crosses, adaptors
- types of non-metallic pipe and tube: CPVC, cross-linked polyethylene (PEX), polyvinyl chloride (PVC)
- design considerations: pipe size, hazard classifications, drainage, pitch and layout, materials, system design, flushing connections, friction loss
- connection types: grooved couplings, flanged, threaded, solvent welded
C-12.03 - Installs copper pipe, tube and fittings
C-12.03 - Installs copper pipe, tube and fittings
| NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
| yes |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
| Reference Code |
Performance Criteria |
Evidence of Attainment |
| C-12.03.01P |
verify location and spacing |
location and spacing are verified according to drawings, project specifications, and codes, standards and regulations |
| C-12.03.02P |
modify copper pipe and tube layout |
copper pipe and tube layout is modified according to site conditions and design considerations |
| C-12.03.03P |
select and use tools and equipment |
tools and equipment are selected and used according to task |
| C-12.03.04P |
select materials |
materials are selected according to drawings, project specifications, and codes, standards and regulations |
| C-12.03.05P |
prepare copper pipe and tube |
copper pipe and tube is prepared for installation according to manufacturers' specifications, and codes, standards and regulations |
| C-12.03.06P |
install fittings on pipe and tube |
fittings are installed on pipe and tube according to drawings, project specifications, and codes, standards and regulations |
| C-12.03.07P |
install dielectric fittings |
dielectric fittings are installed when joining dissimilar metals |
| C-12.03.08P |
install copper pipe and tube in hangers, supports, restraints and bracing |
copper pipe and tube are installed in hangers, supports, restraints and bracing according to drawings, project specifications, and codes, standards and regulations |
| C-12.03.09P |
connect copper pipes and tubes |
copper pipes and tubes are connected using fittings according to drawings, and project and manufacturers' specifications |
| C-12.03.10P |
orient fittings |
fittings are oriented according to application and site conditions |
| C-12.03.11P |
level or pitch copper pipe and tube |
copper pipe and tube are run level or pitched according to drawings, project specifications, and codes, standards and regulations |
Range of Variables (include, but not limited to)
- design considerations: pipe size, hazard classifications, drainage, pitch and layout, materials, system design, flushing connections, friction loss
- materials: solder, brazing rods, flux, sand cloth
- fittings: couplings, flanges, elbows, tees, crosses, adaptors
Knowledge
| Reference Code |
Learning Outcomes and Objectives |
| C-12.03.01L |
demonstrate knowledge of copper pipe, tube and fittings, their components, characteristics, applications and operation
- identify types of copper pipe, tube and fittings, and describe their characteristics and applications
- interpret information about copper pipe, tube and fittings found on drawings and specifications
|
| C-12.03.02L |
demonstrate knowledge of procedures to install copper pipe, tube and fittings
- identify tools and equipment used to install copper pipe, tube and fittings, and describe their procedures for use
- identify workplace hazards, and describe safe work practices for installing copper pipe, tube and fittings
- describe procedures to install copper pipe, tube and fittings
- describe connection types related to copper pipe and tube
- explain effect of electrolysis on piping and tubing materials
- explain effect of galvanic corrosion on piping and tubing materials
- explain friction loss as it applies to copper pipe and tube, and hydraulically calculated systems
- identify design considerations for installing copper pipe, tube and fittings
- describe procedures to prepare and assemble flare and compression joints using hand tools
|
| C-12.03.03L |
demonstrate knowledge of procedures to braze and solder joints
- identify tools and equipment used to braze and solder joints, and describe their procedures for use
- identify workplace hazards, and describe safe work practices for brazing and soldering joints
- describe procedures to braze and solder joints
- identify materials and equipment used for brazing and soldering joints, and describe their applications
- identify types of solders and brazing alloys, and describe their characteristics and applications
- identify types of flux used in soldering or brazing, and describe their purpose, applications and effects
|
| C-12.03.04L |
demonstrate knowledge of regulatory requirements for installing copper pipe, tube and fittings
- identify codes, standards and regulations for installing copper pipe, tube and fittings
- identify codes, standards and regulations for brazing and soldering joints
|
| C-12.03.05L |
demonstrate knowledge of sustainability and environmental stewardship practices
- identify practices that contribute to environmental protection
- describe procedures to dispose of and recycle copper pipe, tube and fittings
- describe procedures to dispose of and recycle brazing and soldering material
|
Range of Variables (include, but not limited to)
- fittings: couplings, flanges, elbows, tees, crosses, adaptors
- types of copper pipe and tube: K, L, M, drawn (hard), annealed (soft)
- connection types: soldering, brazing, grooved couplings, compression fittings, threading
- design considerations: pipe size, hazard classifications, drainage, pitch and layout, materials, system design, flushing connections, friction loss
- materials: solder, brazing rods, flux, sand cloth
- types of solders and brazing alloys: 50/50, 95/5, lead-free, BCuP, BAg
C-12.04 - Paints and labels pipe, tube and fittings
C-12.04 - Paints and labels pipe, tube and fittings
| NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
| yes |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
| Reference Code |
Performance Criteria |
Evidence of Attainment |
| C-12.04.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task |
| C-12.04.02P |
select paint |
paint used for identification and corrosion protection is selected according to project and manufacturers' specifications |
| C-12.04.03P |
mix paint and epoxy |
paint and epoxy are mixed according to manufacturers’ specifications |
| C-12.04.04P |
paint over wrench marks and bare threads |
wrench marks and bare threads are painted over according to project specifications |
| C-12.04.05P |
install labels on pipe |
labels are installed on pipe according to project specifications |
| C-12.04.06P |
dispose of hazardous waste |
hazardous waste is disposed of according to codes, standards and regulations |
Knowledge
| Reference Code |
Learning Outcomes and Objectives |
| C-12.04.01L |
demonstrate knowledge of procedures to paint and label pipe, tube and fittings
- identify tools and equipment used to paint and label pipe, tube and fittings, and describe their procedures for use
- identify workplace hazards, and describe safe work practices for painting and labelling pipe, tube and fittings
- describe procedures to paint and label pipe, tube and fittings
- identify symbols for labelling pipe, tube and fittings
- interpret information about labeling pipe, tube and fittings found on drawings and specifications
|
| C-12.04.02L |
demonstrate knowledge of standards for painting and labelling pipe, tube and fittings
- identify standards for painting and labelling pipe, tube and fittings
|
| C-12.04.03L |
demonstrate knowledge of sustainability and environmental stewardship practices
- identify practices that contribute to environmental protection
- describe procedures to dispose of and recycle painting and labelling materials
|
Task C-13 Installs piping components
Task Descriptor
Sprinkler fitters connect various types of components such as sprinklers, nozzles, valves, pipe sleeves, hangers, supports, restraints and bracing, cross-connection control assemblies and system drainage to the piping system to achieve a complete and effective fire protection system.
C-13.01 - Selects sprinklers and nozzles
C-13.01 - Selects sprinklers and nozzles
| NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
| yes |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
| Reference Code |
Performance Criteria |
Evidence of Attainment |
| C-13.01.01P |
identify sprinklers’ temperature classification |
sprinklers’ temperature classification is identified according to drawings, manufacturers’ and project specifications, and codes, standards and regulations |
| C-13.01.02P |
identify sprinklers and nozzles |
sprinklers and nozzles are identified to provide coverage according to conditions, occupancy classifications and storage arrangement, drawings, manufacturers’ and project specifications, and codes, standards and regulations |
| C-13.01.03P |
interpret information on sprinkler and nozzle listing and manufacturers’ data sheet |
information on sprinkler and nozzle listing and manufacturers’ data sheet is interpreted to provide installation limitations |
Range of Variables (include, but not limited to)
- sprinklers and nozzles: automatic (solder, bulb), standard spray (pendant, upright, sidewall), extended coverage (pendant, upright, sidewall), specialty sprinklers and nozzles (residential, institutional, control mode specific application [CMSA]/large drop, Early Suppression Fast Response [ESFR], in-rack, attic, old-style/conventional, open sprinkler, window, dry)
- conditions: freezing, excessive heat, corrosive environment
- occupancy classifications: light hazard, ordinary hazard, extra hazard
- storage arrangement: high pile storage, in-rack, solid pile
- information: listings, K-factor, temperature, date of manufacture, sprinkler identification number (SIN)
Knowledge
| Reference Code |
Learning Outcomes and Objectives |
| C-13.01.01L |
demonstrate knowledge of sprinklers and nozzles, their components, characteristics, applications and operation
- identify types of sprinklers and nozzles, and describe their characteristics and applications
- describe operating principles of sprinklers and nozzles
- describe fire tetrahedron and properties of water
- interpret information about sprinklers and nozzles found on drawings, specifications, sprinkler and nozzle listing and manufacturers’ data sheet
|
| C-13.01.02L |
demonstrate knowledge of procedures to select sprinklers and nozzles
- identify workplace hazards, and describe safe work practices for sprinklers and nozzles
- describe procedures to select sprinklers and nozzles
- identify conditions, hazard classification and storage arrangements for selecting sprinklers
- identify temperature ratings and colour coding
- identify performance characteristics that apply to sprinklers
- identify location requirements
|
| C-13.01.03L |
demonstrate knowledge of regulatory requirements for sprinklers and nozzles
- identify codes, standards and regulations for sprinklers and nozzles
|
Range of Variables (include, but not limited to)
- sprinklers and nozzles: automatic (solder, bulb), standard spray (pendant, upright, sidewall), extended coverage (pendant, upright, sidewall), specialty sprinklers and nozzles (residential, institutional, CMSA/large drop, ESFR, in-rack, attic, old-style/conventional, open sprinkler, window, dry)
- information: listings, K-factor, temperature, date of manufacture, SIN
- conditions: freezing, excessive heat, corrosive environment
- storage arrangement: high pile storage, in-rack, solid pile
- temperature ratings: ordinary, intermediate, high, extra-high
- performance characteristics: deflector design/spray patterns, orifice size, temperature rating, temperature sensitivity, orientation
- location requirements: bays, beams, girders, joists, open bar joists, open ceilings, trusses, obstructions
C-13.02 - Installs sprinklers and nozzles
C-13.02 - Installs sprinklers and nozzles
| NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
| yes |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
| Reference Code |
Performance Criteria |
Evidence of Attainment |
| C-13.02.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task and manufacturers' specifications |
| C-13.02.02P |
inspect sprinklers and nozzles for damage or defects |
sprinklers and nozzles are inspected for damage or defects |
| C-13.02.03P |
apply thread lubricant |
thread lubricant is applied to prevent leakage and ensure fit according to industry practices and manufacturers' specifications |
| C-13.02.04P |
position and install sprinklers and nozzles |
sprinklers and nozzles are positioned and installed according to drawings, manufacturers’ and project specifications, and codes, standards and regulations |
| C-13.02.05P |
select and install temporary sprinkler protectors |
temporary sprinkler protectors are selected and installed to protect sprinklers and nozzles from potential damage until job is completed |
| C-13.02.06P |
select and install escutcheons and cover plates |
escutcheons and cover plates are selected and installed according to manufacturers' specifications |
| C-13.02.07P |
select and install permanent sprinkler protectors |
permanent sprinkler protectors are selected and installed according to manufacturers' specifications and site conditions |
Range of Variables (include, but not limited to)
- damage or defects: broken bulbs, bent deflectors, bad threads, corrosion, lack of air bubble, no fluid
- nozzles: foam, CO2, clean agent
- temporary sprinkler protectors: manufacturers' supplied protective caps, aluminium foil, plastic bags
- escutcheons and cover plates: concealed, recess, deep cup escutcheons
- permanent sprinkler protectors: sprinkler guards, wax coated, paper bags, cellophane
Knowledge
| Reference Code |
Learning Outcomes and Objectives |
| C-13.02.01L |
demonstrate knowledge of sprinklers and nozzles, their components, characteristics, applications and operation
- identify types of sprinklers and nozzles, and describe their characteristics and applications
- describe operating principles of sprinklers, nozzles and finishing plates
- interpret information about sprinklers and nozzles found on drawings and specifications
|
| C-13.02.02L |
demonstrate knowledge of procedures to install sprinklers and nozzles and their components
- identify tools and equipment used to install sprinklers and nozzles and their components, and describe their procedures for use
- identify workplace hazards, and describe safe work practices for installing sprinklers and nozzles and their components
- describe procedures to install sprinklers and nozzles and their components
- describe procedures used, and factors to consider for the care and handling of sprinklers and nozzles prior to and during installation process
- explain importance of correct positioning for sprinklers and nozzles
- identify spacing and obstruction requirements based on occupancy classification, drawings, manufacturers’ and project specifications, codes, standards and regulations
- identify clearances required between piled storage materials and sprinkler deflectors
- identify factors that affect maximum ceiling temperature
- identify temperature ratings and colour coding
- identify performance characteristics that apply to sprinklers and nozzles
|
| C-13.02.03L |
demonstrate knowledge of regulatory requirements for installing sprinklers and nozzles
- identify codes, standards and regulations for installing sprinklers and nozzles
|
| C-13.02.04L |
demonstrate knowledge of sustainability and environmental stewardship practices
- identify practices that contribute to environmental protection
- describe procedures to dispose of and recycle sprinklers and nozzles
|
Range of Variables (include, but not limited to)
- nozzles: foam, CO2, clean agent
- occupancy classifications: light hazard, ordinary hazard, extra hazard
- temperature ratings: ordinary, intermediate, high, extra-high
- performance characteristics: deflector design/spray patterns, orifice size, temperature rating, thermal sensitivity, orientation
C-13.03 - Installs pipe sleeves
C-13.03 - Installs pipe sleeves
| NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
| yes |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
| Reference Code |
Performance Criteria |
Evidence of Attainment |
| C-13.03.01P |
select pipe sleeve material, diameter and length |
pipe sleeve material, diameter and length are selected according to factors |
| C-13.03.02P |
select and use tools and equipment |
tools and equipment are selected and used according to task |
| C-13.03.03P |
measure and determine pipe sleeve location |
pipe sleeve location is measured and determined according to drawings and concrete scanning |
| C-13.03.04P |
attach pipe sleeve to forms |
pipe sleeve is attached to forms using nails or screws when installed prior to concrete pour according to industry standards |
| C-13.03.05P |
core penetrations for pipe sleeves |
penetrations are cored for pipe sleeves through existing concrete according to task |
| C-13.03.06P |
select and apply fire stopping, caulking and sealant |
fire stopping, caulking and sealant are selected and applied according to drawings, manufacturers’ and project specifications, and codes, standards and regulations |
Range of Variables (include, but not limited to)
- factors: pipe size, wall and floor thickness, codes, standards and regulations
Knowledge
| Reference Code |
Learning Outcomes and Objectives |
| C-13.03.01L |
demonstrate knowledge of pipe sleeves, their characteristics and applications
- identify types of pipe sleeves, and describe their characteristics and applications
- interpret information about pipe sleeves found on drawings, and manufacturers’ and project specifications
|
| C-13.03.02L |
demonstrate knowledge of procedures to size and install pipe sleeves
- identify tools and equipment used to size and install pipe sleeves, and describe their procedures for use
- identify workplace hazards, and describe safe work practices for installing pipe sleeves
- identify factors for selecting pipe sleeve material, diameter and length
- describe procedures to install pipe sleeves
- describe procedures to determine location of pipe sleeves
- describe fire rating requirements for penetrations
|
| C-13.03.03L |
demonstrate knowledge of regulatory requirements for installing sleeves
- identify codes, standards and regulations for installing sleeves
|
| C-13.02.04L |
demonstrate knowledge of sustainability and environmental stewardship practices
- identify practices that contribute to environmental protection
- describe procedures to dispose of and recycle coring material
|
Range of Variables (include, but not limited to)
- factors: pipe size, wall and floor thickness, codes, standards and regulations
C-13.04 - Installs hangers, supports, restraints and bracing
C-13.04 - Installs hangers, supports, restraints and bracing
| NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
| yes |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
| Reference Code |
Performance Criteria |
Evidence of Attainment |
| C-13.04.01P |
select hangers, supports, restraints and bracing |
hangers, supports, restraints and bracing are selected according to factors |
| C-13.04.02P |
select and use tools and equipment |
tools and equipment are selected and used according to task |
| C-13.04.03P |
calculate size and material of trapeze hangers |
size and material of trapeze hangers is calculated according to codes, standards and regulations |
| C-13.04.04P |
calculate rod or brace size and length |
rod or brace size and length are calculated according to factors |
| C-13.04.05P |
cut rod or bracing materials |
rod or bracing materials are cut to length according to site conditions |
| C-13.04.06P |
select and install attachment points for hangers, supports, restraints and bracing |
attachment points for hangers, supports, restraints and bracing are selected and installed according to codes, standards and regulations |
| C-13.04.07P |
fasten hangers, supports, restraints and bracing |
hangers, supports, restraints and bracing are fastened to attachment points and piping on structure material according to factors |
| C-13.04.08P |
select location, material, diameter, angle and length of hangers, supports, restraints and bracing |
location, material, diameter, angle and length of hangers, supports, restraints and bracing are selected according to factors |
| C-13.04.09P |
installs hangers, supports, restraints and bracing to prevent movement |
hangers, supports, restraints and bracing are installed to prevent pipe movement |
Range of Variables (include, but not limited to)
- hangers: riser clamps, pipe clamps, swivel rings, clevis, split rings
- supports: pipe stands, riser clamps, pipe straps
- bracing: ceiling flanges, side beam attachments, C-clamps, longitudinal, lateral, restraint wire, restraint straps, 4-way
- factors: pipe material; pipe size; spacing; application; codes, standards and regulations; location of structural members; drawings; AHJ; project and manufacturers' specifications; pitch
- bracing materials: pipe, angle iron, rod
- structure material: wood, concrete, steel, lath and plaster
- movement: seismic activity, vibration, pipe thrust, water hammer, thermal expansion
Knowledge
| Reference Code |
Learning Outcomes and Objectives |
| C-13.04.01L |
demonstrate knowledge of hangers, supports, restraints and bracing, their components, characteristics and applications
- identify types of hangers, supports, restraints and bracing used in installation of pipe and tube, and describe their characteristics and applications
- identify types of bracing materials, and describe their characteristics and applications
- interpret information about hangers, supports, restraints and bracing found on drawings and specifications
|
| C-13.04.02L |
demonstrate knowledge of procedures to install hangers, supports, restraints and bracing
- identify tools and equipment used to install hangers, supports, restraints and bracing, and describe their procedures for use
- identify workplace hazards, and describe safe work practices for installing hangers, supports, restraints and bracing
- describe procedures to install hangers, supports, restraints and bracing
- describe procedures to install fasteners into structure material
- identify calculations and factors to provide pitch
- identify hangers, supports, restraints and bracing requirements for various systems
- describe principles of sway/seismic bracing and movement
- identify types and sizes of hanger rods, and describe their characteristics and applications
- identify types of protective materials applied to hangers, and describe their purpose and applications
- identify types of fasteners and inserts, and describe their characteristics and applications
|
| C-13.04.03L |
demonstrate knowledge of regulatory requirements for hangers, supports, restraints and bracing
- identify codes, standards and regulations for hangers, supports, restraints and bracing
|
| C-13.04.04L |
demonstrate knowledge of sustainability and environmental stewardship practices
- identify practices that contribute to environmental protection
- describe procedures to dispose of and recycle hangers, supports, restraints and bracing
|
Range of Variables (include, but not limited to)
- hangers: riser clamps, pipe clamps, swivel rings, clevis, split rings
- supports: pipe stands, riser clamps, pipe straps
- bracing: ceiling flanges, side beam attachments, C-clamps, longitudinal, lateral, restraint wire, restraint straps, 4-way
- bracing materials: pipe, angle iron, rod
- fasteners: drop-in inserts, wood screws, coach screw rod, engineered fasteners
- structure material: wood, concrete, steel, lath and plaster
- factors: pipe material; pipe size; spacing, application; codes, standards and regulations; location of structural members; drawings; AHJ; project and manufacturers' specifications; pitch
- pitch: grade on pipe, slope of ceiling, hanger spacing, distance from hanger to attachment points
C-13.05 - Installs cross-connection control assemblies
C-13.05 - Installs cross-connection control assemblies
| NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
| yes |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
| Reference Code |
Performance Criteria |
Evidence of Attainment |
| C-13.05.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task |
| C-13.05.02P |
select and install cross-connection control assemblies |
cross-connection control assemblies are selected and installed according to drawings, manufacturers’ and project specifications, and codes, standards and regulations |
| C-13.05.03P |
install means for forward flow testing |
means for forward flow testing are installed according to drawings, codes and standards |
| C-13.05.04P |
ensure operation of equipment and components |
equipment and components operate according to manufacturers' specifications, and codes, standards and regulations |
Knowledge
| Reference Code |
Learning Outcomes and Objectives |
| C-13.05.01L |
demonstrate knowledge of cross-connection control assemblies, their components, characteristics, applications and operation
- identify types of cross-connection control assemblies, and describe their characteristics and applications
- describe operating principles of cross-connection control assemblies
- interpret information about cross-connection control assemblies found on drawings and specifications
|
| C-13.05.02L |
demonstrate knowledge of procedures to install cross-connection control assemblies
- identify tools and equipment used to install cross-connection control assemblies, and describe their procedures for use
- identify workplace hazards, and describe safe work practices for installing cross-connection control assemblies
- identify factors to consider for selecting and installing cross-connection control assemblies
- identify means for forward flow testing, and describe their requirements, arrangements and installation location
- describe procedures to install cross-connection control assemblies
|
| C-13.05.03L |
demonstrate knowledge of training and certification requirements to test cross-connection control assemblies
- identify training and certification requirements to test cross-connection control assemblies
|
| C-13.05.04L |
demonstrate knowledge of regulatory requirements for cross-connection control assemblies
- identify codes, standards and regulations for cross-connection control assemblies
|
| C-13.05.05L |
demonstrate knowledge of sustainability and environmental stewardship practices
- identify practices that contribute to environmental protection
|
Range of Variables (include, but not limited to)
- types of cross-connection control assemblies: reduced pressure backflow assembly (RP [RPBA]), double check valve assembly (DCVA), air gap
C-13.06 - Installs system drainage
C-13.06 - Installs system drainage
| NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
| yes |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
| Reference Code |
Performance Criteria |
Evidence of Attainment |
| C-13.06.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task |
| C-13.06.02P |
determine pipe size, length and locations of drain lines |
pipe size, length and locations of drain lines are determined and measured according to drawings, manufacturers’ and project specifications, and codes, standards and regulations |
| C-13.06.03P |
determine locations and requirements of components |
locations and requirements of components are determined according to drawings, manufacturers’ and project specifications, and codes, standards and regulations |
| C-13.06.04P |
install drain lines |
drain lines are installed according to drawings, manufacturers’ and project specifications, and codes, standards and regulations |
Range of Variables (include, but not limited to)
- components: drain valves, drain cups, air gaps
Knowledge
| Reference Code |
Learning Outcomes and Objectives |
| C-13.06.01L |
demonstrate knowledge of system drainage, their components, characteristics, applications and operation
- identify types of system drainage, and describe their characteristics and applications
- identify system drainage components and describe their location, purpose and operation
- describe operating principles of system drainage
- interpret information about system drainage found on drawings and specifications
|
| C-13.06.02L |
demonstrate knowledge of procedures to layout and install system drainage and components
- identify tools and equipment used to layout and install system drainage, and describe their procedures for use
- identify workplace hazards, and describe safe work practices for system drainage layout and installation
- describe procedures to lay out and install system drainage and components
|
| C-13.06.03L |
demonstrate knowledge of regulatory requirements for system drainage layout and installation
- identify codes, standards and regulations for system drainage layout and installation
|
| C-13.06.04L |
demonstrate knowledge of sustainability and environmental stewardship practices
- identify practices that contribute to environmental protection
- describe procedures to dispose of and recycle system drainage components
|
Range of Variables (include, but not limited to)
- components: drain valves, drain cups, air gaps
- types of system drainage: main, auxiliary, sectional